903 kW Solar and 3 MW Tesla ESS project located in Carpinteria Ca. Installed over 2000 solar panels to produce over 1.3 million kWh.
Completion Date
Mar 18th 2022
Location
Carpinteria Ca.
Project Size
903 kW solar and 3 MW ESS
Supplier
HES Solar
Benefits
- Cost savings
- Resiliency
- Emissions reductions
Technologies
- Solar PV
- BESS