Mill Creek Estate Resiliency Microgrid

The system defaults into a critical load state during a PSPS (Public Safety Power Shutoff) with active production and storage SOC monitoring to allow specific loads to be re/de-energized via remote access during daytime excess solar production.

Location

Healdsburg, CA

Project Size

160 kW + 275 kWh BESS

Supplier

Sandbar

Benefits
  • Cost savings
  • Resiliency
Technologies
  • Solar PV
  • BESS