Battery Innovation in Kearny Mesa

The battery is located behind the manufacturing site’s retail meter with San Diego & Gas Electric so it can provide energy services for the facility like demand charge management and time-of-day rate shifting. It’s also equipped with a CAISO meter and RIG so it can be an energy resource for the California grid. Service Provided: Behind-the-meter operation: Time-of-use bill management, demand charge reduction, demand response Grid Stability: Regulation and operating reserves Sustainable Capacity: Flexible battery storage-based resource adequacy

Completion Date

Mar 27th 2019

Location

Kearny Mesa, San Diego, CA, US

Project Size

1000 kW / 4000 kWh

Supplier

Peak Power Inc.

Benefits
  • Cost savings
Technologies
  • storage